{"id":6261,"date":"2018-07-17T14:12:56","date_gmt":"2018-07-17T13:12:56","guid":{"rendered":"http:\/\/www.barnetunison.me.uk\/wp\/?p=6261"},"modified":"2018-07-17T14:12:56","modified_gmt":"2018-07-17T13:12:56","slug":"barnet-homes-fire-doors-not-up-to-standard","status":"publish","type":"post","link":"https:\/\/www.barnetunison.me.uk\/wp\/2018\/07\/17\/barnet-homes-fire-doors-not-up-to-standard\/","title":{"rendered":"Barnet Homes Fire doors not up to standard"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-6262 aligncenter\" src=\"https:\/\/www.barnetunison.me.uk\/wp\/wp-content\/uploads\/2018\/07\/tbg-structure-2016-01.png\" alt=\"\" width=\"301\" height=\"330\" srcset=\"https:\/\/www.barnetunison.me.uk\/wp\/wp-content\/uploads\/2018\/07\/tbg-structure-2016-01.png 800w, https:\/\/www.barnetunison.me.uk\/wp\/wp-content\/uploads\/2018\/07\/tbg-structure-2016-01-274x300.png 274w, https:\/\/www.barnetunison.me.uk\/wp\/wp-content\/uploads\/2018\/07\/tbg-structure-2016-01-768x842.png 768w\" sizes=\"auto, (max-width: 301px) 100vw, 301px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>Below is an extract from the Housing Committee\u00a0Thursday the\u00a0 21st of June, 2018<\/p>\n<p><a href=\"http:\/\/barnet.moderngov.co.uk\/documents\/g9486\/Public%20reports%20pack%2021st-Jun-2018%2019.00%20Housing%20Committee.pdf?T=10\">http:\/\/barnet.moderngov.co.uk\/documents\/g9486\/Public%20reports%20pack%2021st-Jun-2018%2019.00%20Housing%20Committee.pdf?T=10<\/a><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>Appendix 1<\/strong><\/p>\n<p style=\"text-align: center;\">\n<strong>Fire safety and the Council\u2019s response to the Grenfell Tower fire disaster<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>Further developments \u2013 <strong>Manse Masterdoor<\/strong><\/p>\n<p>23.On the 15th March 2018, the Government released a statement regarding potential<br \/>\nissues identified with door-sets produced by the company Manse Masterdoor.<br \/>\nFurther testing of these doors was undertaken and an updated statement made on<br \/>\nthe 16th May 2018. An excerpt of this statement is as follows:<\/p>\n<p>\u201cThe expert panel has concluded there is a <strong>performance issue with these Manse<\/strong><br \/>\n<strong>Masterdoor fire doors,<\/strong> <strong>which do not consistently meet the 30-minute fire resistance\u00a0<\/strong><strong>standard.<\/strong> Nevertheless, the National Fire Chiefs Council has advised the expert panel the risk to public safety remains low\u201d<\/p>\n<p>24.The full statement can be viewed at;<br \/>\n<a href=\"http:\/\/www.gov.uk\/government\/news\/update-on-fire-doors-investigation-risk-topublic-safety-remains-low\">http:\/\/www.gov.uk\/government\/news\/update-on-fire-doors-investigation-risk-topublic-safety-remains-low<\/a>.<br \/>\nThe statement also confirmed that the MHCLG is<br \/>\nwriting to affected customers. The affected doors were supplied between 2013<br \/>\nand 2014.<\/p>\n<p>25.<strong>There is a total of 1,183 of these doors on Barnet Homes properties.<\/strong> All affected<br \/>\nresidents have been written to confirming the steps are being taken to replace the<br \/>\ndoor-sets, whilst also confirming the Governments advice that the risk posed<br \/>\nremains low.<\/p>\n<p>26.In addition, Barnet Homes has arranged for the fire risk assessments to blocks<br \/>\ncontaining these doors be updated in light of this matter. This will be completed by<br \/>\n29th June 2018. These fire risk assessments will form the basis for prioritising the<br \/>\ndoor replacement programme.<\/p>\n<p>27.<strong>The estimated costs for replacing these doors is in the region of \u00a31.5m<\/strong>, however Barnet Homes are engaged in positive discussions with the contracted party that<br \/>\ninstalled the doors in order to mitigate any cost implications to the Council<\/p>\n<hr \/>\n<p>&nbsp;<\/p>\n<p><strong>Worryingly, the same document details a fire at a block of 20 flats in Graham Park Estate.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>18.In early April 2018, a <strong>serious fire<\/strong> occurred at a small block on the <strong>Grahame Park<\/strong><br \/>\n<strong>Estate.<\/strong> Although nobody was hurt, <strong>the whole block of 20 flats is now uninhabitable,<\/strong><br \/>\nand residents have been provided with alternative accommodation. Following this<br \/>\nfire, Barnet Homes instructed an intrusive survey of the communal areas of the<br \/>\nblock <strong>which highlighted the need for some improvements to the fire separation<\/strong><br \/>\nmeasures within areas not generally accessible through the Fire Risk Assessment<br \/>\nprocess, such as within enclosed riser ducts and suspended ceiling void spaces.<br \/>\n<strong>Surveys were undertaken<\/strong> to blocks of a similar construction on the same estate,<br \/>\nwhich <strong>highlighted the need for similar improvements<\/strong>. Arrangements have been<br \/>\nmade to implement works to address these matters.<\/p>\n<p>19.Whilst the Regulatory Reform (Fire Safety) Order 2005 focuses on communal<br \/>\nareas, Barnet Homes have piloted some surveys which go over and above these<br \/>\nrequirements and include areas within dwellings. Within some properties areas for<br \/>\nfurther improvements have been identified of a similar nature to that of the highrise<br \/>\nproperties.<\/p>\n<p>20.<strong>It is therefore recommended that Barnet Homes extend its programme of fire safety\u00a0<\/strong><strong>works to include all blocks of flats.<\/strong><\/p>\n<p>This would include;<\/p>\n<p>\uf0b7 Surveying of sample properties internally as part of an extended fire risk<br \/>\nassessment programme<\/p>\n<p>\uf0b7 The installation of enhanced fire detection and alarm systems within all<br \/>\ntenanted flats.<\/p>\n<p>\uf0b7 That measures identified as part of the extended fire risk assessment surveys<br \/>\nare undertaken through a programme of works to be developed as the surveys<br \/>\nprogress.<\/p>\n<p>21.<strong>Until the surveys have been undertaken to all blocks it is difficult to accurately<\/strong><br \/>\n<strong>estimate the cost of undertaking the arising works.<\/strong> The next fire safety update to<br \/>\nthe Housing Committee will include more a detailed and costed programme along<br \/>\nwith proposals for funding these works.<\/p>\n<p>22.Barnet Homes will make use of existing capital budgets to address any urgent<br \/>\nworks identified that need to be dealt with prior to the October 2018 Housing<br \/>\nCommittee up to a value of \u00a3200,000.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Below is an extract from the Housing Committee\u00a0Thursday the\u00a0 21st of June, 2018 http:\/\/barnet.moderngov.co.uk\/documents\/g9486\/Public%20reports%20pack%2021st-Jun-2018%2019.00%20Housing%20Committee.pdf?T=10 &nbsp; Appendix 1 Fire safety and the Council\u2019s response to the Grenfell Tower fire disaster &nbsp; Further developments \u2013 Manse Masterdoor 23.On the 15th March 2018, the Government released a statement regarding potential issues identified with door-sets produced by the company Manse Masterdoor. Further testing<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[91,90,60,96,76,50],"tags":[],"class_list":["post-6261","post","type-post","status-publish","format-standard","hentry","category-barnet-group","category-barnet-homes","category-community","category-hs","category-housing","category-local"],"_links":{"self":[{"href":"https:\/\/www.barnetunison.me.uk\/wp\/wp-json\/wp\/v2\/posts\/6261","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.barnetunison.me.uk\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.barnetunison.me.uk\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.barnetunison.me.uk\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.barnetunison.me.uk\/wp\/wp-json\/wp\/v2\/comments?post=6261"}],"version-history":[{"count":1,"href":"https:\/\/www.barnetunison.me.uk\/wp\/wp-json\/wp\/v2\/posts\/6261\/revisions"}],"predecessor-version":[{"id":6263,"href":"https:\/\/www.barnetunison.me.uk\/wp\/wp-json\/wp\/v2\/posts\/6261\/revisions\/6263"}],"wp:attachment":[{"href":"https:\/\/www.barnetunison.me.uk\/wp\/wp-json\/wp\/v2\/media?parent=6261"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.barnetunison.me.uk\/wp\/wp-json\/wp\/v2\/categories?post=6261"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.barnetunison.me.uk\/wp\/wp-json\/wp\/v2\/tags?post=6261"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}