The Tories Are Out Of Barnet!

To quote CeCe Peniston: “Finally!” (For those of us young enough to remember popular music of the 90s) https://youtu.be/xk8mm1Qmt-Y

On behalf of our members our Barnet UNISON Branch Secretary, John Burgess, has written to the newly elected Council Leader, Barry Rawlings, congratulating him on the success of the Labour Party and requesting to meet with him.

This is John making a statement to all Barnet UNISON members

For 20 years our members have had to deal with brutality of outsourcing and attacks on our time off to represent members. Our members in the Barnet Group, Capita, NSL, BELS and ISS will be expecting to see positive change for them. UNISON’s General Secretary, Christine McAnea has also been written to requesting her support for assistance in our discussions with Barnet Labour.

We’ll be providing regular updates to our members and our wider UNISON family and trade union community on our progress.

End.

Fire safety issues in Barnet Libraries

Over the last year Barnet UNISON have been very concerned about Fire Safety in Barnet Libraries.

This arose because the Council were slow in providing Fires Risk Assessments (FRAs) for Libraries and in complying with the actions resulting from these assessments.

During 2017 Library buildings were altered as part of the Library Program. This included internal structural changes and the installation of technology to permit unstaffed opening hours. These changes meant that the building’s Fire Risk Assessments (FRAs) needed reviewing and replacing.

In addition a new Library, Finchley Church End was opened in September 2017 which also required a Fire Risk Assessment

UNISON began asked the Council for these Fire Risk Assessment prior to library staff returning to each site and before the Libraries opened to the public.

However the Council only produced these FRA weeks and months after library staff and the public were admitted to the Libraries.

Examples include;

1. North Finchley Library reopened to the public on the 12th June 2017

The FRA issued on the 24th August 2017

 

2. Golders Green Library reopened to the public on the 3rd July 2017                                  The FRA issued on 10th August 20.17

 

3. Osidge Library reopened to the public on the 26th June 2017

The FRA issued on the 16th August 2017

The FRAs when they were produced identified a number of actions for the Council to carry out. The majority of these were described as a

  • “…..a potential contravention of the Regulatory Reform (Fire Safety) Order 2005, or a high risk to Health & Safety from fire”

The deadline for complying with most of these actions was three months from the issue of the FRA.​​

A few of the issues are listed below:

  • Replacing Fire Doors at some with doors with the required level of fire Resistance
  • Fire Refuge Area communication system not working at a number of sites
  • The Emergency Lighting untested at a number of sites
  • No record of the five yearly structural inspection of the external fire escapes at a number of libraries
  • Incomplete Fire Safety signage missing at a number of sites
  • Smoke seals needed for doors at a number of libraries
  • Insufficient numbers of fire extinguisher at one site
  • Fire extinguisher incorrectly mounted at a number of sites
  • Fire door not closing correctly at one library
  • Basement area at one library requiring upgrading to required level of fire resistance
  • Width of staff exit at one site below recommendations
  • Confirmation needed that there is fire separation in the roof void between the library and the commercial use area at one site

Barnet UNISON have been inspecting Libraries to see if the FRA actions have been carried out. In most cases these have not been completed. UNISON have raised this at a number of escalating meetings to the highest level and in our inspection reports.

But no real evidence was presented to Barnet UNISON by the Council that most of the issues had been resolved. Barnet UNISON informed the Council on a number of the occasions that if this continued we would be compelled to contact the Health and Safety Executive (HSE) to report our concerns.

Despite this the Council failed to meaningfully respond and with regret Barnet UNISON reported our concerns to the Health and Safety Executive.

The Council have since then provided UNISON with a plan of works to act upon the FRAs but while this is welcome. These action should have been completed months ago.

The Council inaction has in UNISON view being largely caused by various Council/Capita management teams’ failure to take responsibility to have the Fire Risk Assessment in place in good time and to respond in sufficient time to resolve the problems identified in these assessments.

Barnet UNISON do not believe these failures have been due to library staff on site, who have reported these problems according to Council  procedures and to their Trade Union , and who have themselves been put at risk by the Council.

Barnet UNISON will continue in our campaign to make Barnet Libraries safe for our members, all Library staff and the public.

To this end we call on the Council to:

  • Ensure that libraries and other Council buildings have up to date FRAs in place before staff and the public are admitted
  • Act speedily and effectively to comply with Fire Risk Assessments
  • Review the management of Fire Safety arrangements and monitoring within the Council
  • Work with UNISON and other concerned parties in addressing the risks and hazards in identified in Fire Risk Assessments.

Please note: The following services are provided by #Capita:

  • Estates
  • Health and Safety
  • Project Management

***UPDATED Barnet residents don’t blame our members working for Street Cleansing

Last week Barnet UNISON members working in Street Cleansing we called to a meeting and informed of a massive cut to overtime.The news came out of the blue, our members some who have been working for Barnet for decades were both angry and bewildered by this decision.Staff were told there was no longer a budget to cover the service and told that they shouldn’t rely on overtime payments. This did not go down well with the workforce who are the lowest paid in the Council and desperately rely on the overtime payments over the weekend.

This news follows quickly on from the recent 19% cut in the number of staff charged to keep the streets of Barnet clean just before Christmas last year.

In order to explain the cut and its impact on Barnet, Street Cleansing service for Saturday and Sundays which goes from Oakleigh Road depot.

Please note the figures below are for just one side of the borough. The other half of the service goes out from Harrow Depot (we won’t go why we have a depot outside Barnet in this post).

8 hours Finchley Central

8 hours North Finchley

8 Hours East Finchley

4 Hours East & New Barnet

4 hours Friern Barnet/Colney Hatch

4 Hours Whetstone

4 Hours Greenhill/ Mays Lane

8 Hours High Barnet

4 Temple Fortune

8 Golders Green

8 Cricklewood

8 Edgware

4 Mill Hill

8 Watling

4 Hendon Central

4 West Hendon

4 Brent Street

8 Hours response team x 2 = 16 hours

This makes that 92 hours for the whole of the borough.

The new service which started last weekend is a one 7.5 ton vehicle with one driver and one loader (16 hours) to cover all the above areas in Barnet.

This is a reduction of 78 hours per day.

Barnet UNISON has unsuccessfully attempted to try to restore the service for Barnet residents. We have sought clarification as to whether normal service will resume from 1 April 2018, we are still waiting. Our members were reporting increases in fly tipping before the workforce was cut, but still the Council implemented the cut. This massive cut to street cleansing at the weekends is going to have a dramatic impact on our borough.

Meanwhile we hear the Council have enough money to pay “eye watering” payments to Capita and seem to have very little control over agency/consultancy spend.

Barnet Supplier Payments – yet another reason why we need to start planning for change

http://reasonablenewbarnet.blogspot.co.uk/2018/02/barnet-supplier-payments-yet-another.html

But what do we know.